MICRO IRRIGATION SITE VISIT OF UPMIP PROJECT

UPMIP-FIELD VISIT  (14-09-2024)


Written by -Vinod kumar dubey 

Re-Inspection Agency - DR. AMIN CONTROLLERS PVT LTD 


Project Name - UPMIP


Location-Agra- Lakhanpura 

Date:- 14-09-2024

Supplier - Kisan Irrigation & infrastructure Limited 


Registration number 

2324-AGR-47

2324-AGR-50

2324-AGR-51


Today got the opportunity to Visit of UPMIP project -MIS cases sites in Agra region.




Trail Run Done on -17/12/2023


                                       Trail runphoto during Trail Run on 17/12/2023




we visited many farms and also met many farmers to know there thoughts about Micro Irrigation system which is installed by Kisan irrigation & infrastructure PVT LTD in UPMIP PROJECT-UP Government.



And to know the opinion of the farmers in terms of Agronomical service and agriculture benefits. 40 nozzles were running at a pressure of 0.5, which is a sign of good results in areas with less water! 



Also attend small Farmer meet and  discuss about after installation services of micro irrigation system and Cleaning the micro irrigation system after cultivation with cleaning chemicals

Acids used for drip clean

-Hydrochloric Acid: 35%

-Nitric Acid: 33%

-Sulfuric acid: 65%

-Ortho Phosphoric Acid: 85%


Dosage: 1-2 liters/acre

Mixture: Mix in 100 liters of water

Method: Inject into the sideline through the venturi at the end of the siraya, and leave for 24 hours. Then flush the drip line.




Thanks🙏 


Courtesy of

VINOD KUMAR DUBEY

Copyright © reserved

Comments