MICRO IRRIGATION SITE VISIT OF UPMIP PROJECT
UPMIP-FIELD VISIT (14-09-2024)
Written by -Vinod kumar dubey
Re-Inspection Agency - DR. AMIN CONTROLLERS PVT LTD
Project Name - UPMIP
Location-Agra- Lakhanpura
Date:- 14-09-2024
Supplier - Kisan Irrigation & infrastructure Limited
Registration number
2324-AGR-47
2324-AGR-50
2324-AGR-51
Today got the opportunity to Visit of UPMIP project -MIS cases sites in Agra region.
Trail Run Done on -17/12/2023
Trail runphoto during Trail Run on 17/12/2023
we visited many farms and also met many farmers to know there thoughts about Micro Irrigation system which is installed by Kisan irrigation & infrastructure PVT LTD in UPMIP PROJECT-UP Government.
And to know the opinion of the farmers in terms of Agronomical service and agriculture benefits. 40 nozzles were running at a pressure of 0.5, which is a sign of good results in areas with less water!
Also attend small Farmer meet and discuss about after installation services of micro irrigation system and Cleaning the micro irrigation system after cultivation with cleaning chemicals
Acids used for drip clean
-Hydrochloric Acid: 35%
-Nitric Acid: 33%
-Sulfuric acid: 65%
-Ortho Phosphoric Acid: 85%
Dosage: 1-2 liters/acre
Mixture: Mix in 100 liters of water
Method: Inject into the sideline through the venturi at the end of the siraya, and leave for 24 hours. Then flush the drip line.
Thanks🙏
Courtesy of
VINOD KUMAR DUBEY
Copyright © reserved
Comments
Post a Comment